Problem 64: Drill 10.1M to 10.2M ft; pressure 5M psig. At 12M ft ROP increases. Surface casing 5M ft; LOT calculated fracture MW 14.5 ppg. Standpipe pressure is 650 psi. Using a 200-psi trip margin the barite (sacks) needed to weight up the 800 bbl mud system from 9.8 ppg to the KMW?
Res pressure: Pr = 9.8(0.052)12,000 ft + 650 psi = 6,765 psi.
KWM: = (6765+200)/(0.052*12,000) = 11.16 lbm/gal.
(35 – W1)/(35 – W2) = (11.16 – 9.8)/(35 – 11.16) = 1.057 bbl bar/bbl mud.
Volume = 1.057(800) = 845.6 bbl
Sacks: 845.6 bbl (1/sk/100 lbm)(35 lbm/gal)(42 gal/bbl) = 671 sacks (C).
Note this problem has the wrong answer in the answer key, as does the original SPE source for the problem; I should not have been so trusting....
UPDATE: The 2019 Update SPE Petroleum Engineering Reference Guide (provided during the exam) shows the following:
I've shown traditional way of solving above, but using the provided equation gets the same thing:
1470*((11.16-9.8)/(35-11.16)) = 83.9*8 = 671 sacks.
Note I would read TS12 on P105 to get familiar with this sort of problem. One of the issues with the reference guide is it gives only a few specific equation options for calculating and doesn't show how the equation is a function of Wf/Wi...and the exam most certainly could expect you to understand how this all works for any situation: (1. Weight up add V. 2. Weight up same V. 3. Dilute & dump). I'll include a few types of these problems using the Reference Guide on the 2021 problem set.
Source: GB 1 DRL 1, 4 MUD 1; A Guide to Prof. Reg. for PEs, SPE, 1991.